← All plans
triathlonadvanced
Olympic Triathlon (1.5 km / 40 km / 10 km)
Olympic-distance build: longer aerobic base, CSS and open-water skills, sweet-spot → threshold bike work, 10K-pace running and race-specific bricks, then a taper.
- Length
- 16 weeks
- Weekly load
- up to ~14.0 h/wk at peak
- Peak week
- 14 h
Who it's for
Multiple seasons racing; structured training with power/pace/HR; 8+ h/wk history.
Sample week 1
| Day | Session | Min | Intensity |
|---|---|---|---|
| Mon | Recovery Spin | 50 | easy |
| Tue | CSS Test | 24 | hard |
| Sweet Spot Intervals | 80 | hard | |
| Wed | Easy Run | 40 | easy |
| Strength (tri) | 35 | easy | |
| Endurance Ride | 65 | easy | |
| Thu | Run Time Trial (20 min) | 45 | hard |
| Technique + Aerobic Swim | 48 | easy | |
| Fri | Easy Technique Swim | 37 | easy |
| Strength (tri) B | 35 | easy | |
| Sat | Long Ride | 90 | easy |
| Brick Run (off the bike)Brick | 20 | easy | |
| Sun | Long Run | 55 | easy |
| Endurance Swim | 48 | easy |